Two cars dragged from Neponset in Hyde Park

It’s rare to find a fully submerged car in a river, never mind two of them.

May 2016 — During the Neponset River cleanup in Hyde Park in the fall of 2015, volunteers knew to expect trash in the water, but no one expected to find a fully submerged car, never mind two of them.

During the following spring cleanup, with the help of the Merrimack River’s Clean River Project, the MA State Police, and Interstate Wrecker Service of Canton, a barely recognizable 1970’s Gran Torino and a 1990’s New Yorker sedan – both reported stolen – were removed from the bed of the Neponset River.

Photo credit Tom Palmer.

NepRWA Executive Director Ian Cooke surveys the scene. The white floating bottle marks the first car, in eight feet of water, just downstream of the Dana Avenue bridge, with the Boston DPW yard at the rear.
Diver Mike Nalen of Clean River directs traffic beside the half-emerged Torino, once registered in Avon, MA.
After 40 years in the river, even a steel frame rusts out, and big chunks will come off if tugged–in this instance, the engine and front end. Incidentally, because the Torino was found with its windows closed, there was some concern that it might contain human remains, but none were discovered.
The 2nd car, a 1990s Chrysler New Yorker, was found just upstream of the Fairmount Avenue bridge. NepRWA Exec. Director Ian Cooke assists from a canoe.
Here’s the car halfway up the bank with Fairmount Avenue at the rear. In contrast to the Torino, it remained intact.
But the windows were open and the car was filled with mud to the headrests.
Here’s the plate from the New Yorker. Both plates were legible and allowed State Troopers to ID the cars.
The New Yorker was hoisted intact over the fence around 12 Fairmount Court, the former site of Lewis Chemical. That was the last we saw of it.

Fast Forward a Decade or so…

On March 14, 2022, the Lower Neponset River, between Mother Brook in Hyde Park and the Baker Dam in Milton/Dorchester Lower Mills, was designated as a Superfund site by the EPA.

On November 10th, 2025, the U.S. Environmental Protection Agency (EPA) released its Phase I Action memorandum, which contains general information on its proposed cleanup method for the first mile of the Superfund Site, which spans from where Mother Brook connects to the Neponset River to the Tileston and Hollingsworth (T&H) Dam.  

The release of this document and what it contains is a huge win for the Neponset, as EPA plans to conduct a robust cleanup that will remove at least the top three feet of contaminated sediment in the river bottom and contamination along the riverbanks within this first mile, including the removal of the dilapidated T&H dam.  

For any questions about the project, please email NepRWA Greenways Director, Andres Ripley, at ripley@neponset.org

T&H Dam, Hyde Park.

Similar Posts